Ecommerce website is live now.. You can buy any documents direct from our Store at the menu
Chemical SOP
Microbiology SOP
Warehouse SOP
Manufacturing SOP
Information technology SOP
ACTIVITIESTESTFREQUENCYREFERENCE
Instrument CalibrationAs per SOPYearly (±30 days)As per SOP
Type A CleaningVisual InspectionBatch to Batch or after 10 batchesAs per SOP
Type B CleaningVisual InspectionProduct to Product
UV Verification
Control Sample VerificationAppearance (All dosage)After every 6 months (±7 days) Control sample shall be kept for Expiry + yearSchedule M of Drug & Cosmetic Act
Bulging in Strips (Tablets & Capsules)
Obnoxious odour (All dosage from)
Leakage(All dosage form)
Solidification of powder (DPI)
Cake formation (Sachet)
Layer separation (Liquid)
Balance VerificationBubble of Spirit level shall be at centreDailyIn-House
Balance CalibrationAccuracyMonthly (±3 Days)USP <41> USP <1251>
Linearity
Precision
Corner Load
Weight CalibrationBy outside partyYearly (Outside Party)As per SOP
Temperature /RHData loggers kept at worst locationsInitially and after every 4 hourAs per VMP & respective protocols
Equipment Qualification (Oral)Sampling done from worst case locations3 & 5 Years (±1 month)
Equipment Qualification (Ointment)2 & 5 Years (±1 month)
Equipment Qualification (Parentreral)6 months, 1 year & 2 Year (3 & 5 Years (±1 month)
Autoclave Qualification (Parenteral)Heat Distribution & Penetration study in Load Chamber1 Year (- 1 month)HTM 2010 Part 3 Volume4, EU GMP, Annex 4 PDA Technical Report 01 Schedule M WHO TRS 961, 2011, Annex 6 USP <1229> BS EN 285: 1997, ISPE, ASTM
F0 Calculation
Determination of SAL & SLR
Biological Challenge Test
Area Qualification /HVACAir Change rateHalf YearlySchedule M
PAO testYearlySchedule M
Non-Viable Particle CountYearlySchedule M & ISO 14644
Air Flow Pattern2 YearISO 14644
Recovery Test2 YearISO 14644
Viable Particle CountYearlySchedule M
Differential PressureYearlySchedule M
Temperature &RHYearlySchedule M
AHU Duct DesignDuct Leak TestDuring Initial Qualification or Whenever any changeASHRAE, ASTM, SMACNA
Duct Design
Purified Water SystemDescriptionInitiallyIndian Pharmacopoeia & In-House
Conductivity
Total Organic Carbon /Oxidisable Substance
Acidity/Alkalinity
Nitrates
Heavy Metals
Microbial Count
Pathogens (Escherichia coli, Salmonella, Pseudomonas aeruginosa, Staphylococcus aureus)
Water for InjectionDescriptionInitiallyUSP 39 & IP
pH
Acidity & Alkalinity
Nitrates
Total Organic Carbon/Oxidisable Substance
Conductivity
Microbial Count
Bacterial Endotoxin Test
Compressed AirOil ContentYearlyISO 8573
Moisture Content
Carbon Dioxide
Carbon Mono Oxide
Sulphur Dioxide
Hydrocarbons
Nitrogen Oxide
Dew Point
Non- Viable Particle Count
Viable Particle Count
NitrogenOil ContentHalf YearlyISO 8573
Moisture Content
Carbon Dioxide
Carbon Mono Oxide
Sulphur Dioxide
Hydrocarbons
Nitrogen Oxide
Dew Point
Non- Viable Particle Count
Viable Particle Count
Oxygen Content
Nitrogen Purity
Pure Steam GeneratorDescriptionYearly (±1 Month)HTM 2010, Part 03
pH
Conductivity
Total Organic Carbon
Nitrate
Acidity & Alkalinity
Total Bacterial Count
Bacterial Endotoxin Test
Non-Condensable Gas Determination
Dryness Fraction Test
Super Heat Test
Visually Inspector QualificationQualificationYearly (- 1 month)USP <1790>, ISPE, PDA Guideline
Rotation of Visual InspectorMicrobial CountAfter every 2 hourAs per SOP
IPQA ChecksProduct physical parametersInitial & After every 1 hourAs per BMR & BPR
Alert & Action LimitChemical & Microbial TestsAfter 3rd Phase & YearlyWHO TRS 961 & 970
Water trendChemical & Microbial TestsDaily Sampling (Trend Preparation monthly)
Weekly & Fortnightly (Trend Preparation Quarterly)
Monthly &Quarterly (Trend Preparation Yearly)
SOP & ManualsDocumentationAfter every 3 years or whenever requiredAs per SOP
Stability (Accelerated)Upto 6 monthsQ1A (R2)
Stability (Long Term or Intermediate)After + 1 Year ExpiryAs per SOP
BMR/BPR5 Year from date of manufacturingAs per SOP
Log BooksUnlimitedAs per SOP
Cleaning Validation / VerificationChemical & Microbial TestIntroduction of New Product & YearlyHealth Canada, PIC/S 006, PDA Technical Report 29, APIC
Obsolete/Discontinued DocumentsDocumentationAfter 5 YearAs per SOP
Mock RecallYearly
Self InspectionHalf Yearly
PoliciesUpto Lifetime
Site Master FileUpto Lifetime
Validation & QualificationUpto Lifetime
Training & Medical RecordsUpto Lifetime
Technology TransferUpto Lifetime
Layout & P & ID DocumentsUpto Lifetime
Vendor QualificationQualificationUpto LifetimeAs per Protocol
Change Control procedureDocumentationUpto LifetimeAs per SOP
STP & STSUpto Lifetime
QMS DocumentsOne Year after Expiry
COAOne Year after Expiry
Checklist & FormatsOne Year after Expiry
Media FillSimulation of Whole aseptic practices by growth mediumHalf YearlyPICS 007, ISPE GUIDE, ANVISA, Schedule M, FDA_GFI_SEPT 2004, WHO TRS 961, 2011, Annex 6, EU GMP, PDA Technical Report 22 & 28
Container Closure Integrity Test
Personnel QualificationQualification2 YearAs per protocol
Internal AuditDocumentationYearlyAs per SOP
Preventive MaintenanceQuarterly
Building MaintenanceQuarterly
Ground water storage tankYearly (±30 days)
CIP/UF/RO/EDI/Distribution line SanitizationMonthly
Vent Filter IntegrityQuarterly (±7 days)
UV LampAfter working hours or intensity reduce to 15 w/m2
Riser FilterAfter every product changeover or after 10 same batches
Pre-Filter15 days (±3 days)
Fine FilterMonthly (±3 days)
Bore Well Water TestingYearly
HEPA Filter (Grade A)5 Years (±6 months)
GPS time verificationYearly (±1 month)
Multi Grade FilterΔP across MGF more than 1.0 kg/cm2
Resin of Softener replacementHardness more than 4 ppm after regeneration
CIP/SIP ValidationCleaning in Place / Steam in PlaceYearly (In-house)PDA Technical Report No. 61 PDA Technical Report No. 01 HTM 2010, Part 03
Dry Heat SterilizerHeat Penetration Study in Load ChamberYearlyHTM 2010, Part 3 USP<1228> PDA Technical Report No. 3
Endotoxin Challenge Test
Tunnel ValidationHeat Penetration Study in Load ChamberHalf YearlyPDA Technical Report No. 3 USP <1228>
Process ValidationEvaluation of Critical Process ParametersIntroduction of New Product, Change in Batch Size, Change in VendorProcess Validation: General Principle & practices, January 2011 EU: Volume4, Annex 15 SUPAC MR-IR-SR
Temperature Mapping of Storage areasHot point determinationEvery 3yearISPE Guide WHO TRS 961
Temperature Mapping of EquipmentsHot point determinationYearly for Equipments
Door Opening
Power Failure
PLC ValidationValidation PlanInitiallyPIC/S, GxP Compliance WHO Data management ISPE GAMP 5 21 CFR Part 11 EU GMP Annex 11
Initial Risk Assessment
Installation Qualification
Operational Qualification
Final Risk Assessment
Filtration ValidationAs per protocolInitiallyPDA Technical Report 22
StabilityAs per protocolInitiallyQ1A(R2)
Yearly
Change in Packing configuration
Change in Manufacturing Process
Filling & Sealing Machine ValidationSensor Challenge TestYearlyIn-house
Speed Verification
Fill Volume Variation
Sealing Quality
Cold ChamberChallenge Test (2-8°C)After every 15 daysAs per SOP
Verification of Hot & Cold PointDailyAs per SOP
Sample analysis timeRaw material30 daysAs per SOP
Finished Goods30 days
Packaging15 days
Packaging (Sterile)30 days
Stability28 days
Reduced testing/Skip testing/Periodic Sampling PlanPackaging material (Existing Vendor)Material quality review shall be performed yearlyAs per SOP
Packaging material (New Vendor)First 03 batchesAs per SOP

Leave a Reply

Your email address will not be published. Required fields are marked *

error: Content is protected !!