Ecommerce website is live now.. You can buy any documents direct from our Store at the menu
Chemical SOP
Microbiology SOP
Warehouse SOP
Manufacturing SOP
Information technology SOP

Ointments qualifications in pharma plays a significant role. Ointments are cosmetic products that are applied externally to the skin. When applied to the skin, they frequently have an oily or greasy consistency and may feel “stiff.” Ointment bases come in three main categories: oleaginous (greasy) bases, which reject water; water-absorbing bases, which are also greasy but enable water to absorb; and water-miscible bases (vanishing creams or water-soluble bases).

Types of Ointments (On the basis of penetration):

  1. Epidermic Ointment: These Ointments are intended to produce their action on the surface of the skin and produce local effect, they are not absorbed.
  2. Endodermic Ointment: These Ointments are intended to release the medicaments that penetrate into skin.
  3. Diadermic Ointment: These Ointments are intended to release the medicament that pass through the skin and produce systemic effect.

Ointments are made in the pharmaceutical industry by melting oil and aqueous phases in two distinct jacketed vessels with agitators to ensure correct mixing. Through valves and pipes, the two stages are transported to the main ointment vessel. Agitation is produced by the additional stirrers in the primary vessel. A consistent combination of the base and medication is essential during the entire procedure. Potential difficulties resulting from ineffective mixing and poor mixer design include the formation of agglomerates and non-uniform medication distribution in the base. In the dead places of the vessel, the content is not evenly mixed. As a result, additional actions are needed for recirculation to prevent product waste accumulated at dead spots.

  1. INSTALLATION QUALIFICATION OF WATER PHASE VESSEL- 1260 LTRS
  2. OPERATIONAL QUALIFICATION OF WATER PHASE VESSEL
  3. INSTALLATION QUALIFICATION OF WAX PHASE VESSEL- 1260 LTRS
  4. OPERATIONAL QUALIFICATION OF WAX PHASE VESSEL
  5. INSTALLATION QUALIFICATION OF MANUFACTURING VESSEL-1765 LTRS.
  6. OPERATIONAL QUALIFICATION OF MAIN MANUFACTURING VESSEL
  7. INSTALLATION QUALIFICATION OF STORAGE TANK-1900 LTRS.
  8. OPERATIONAL QUALIFICATION OF STORAGE TANK
  9. INSTALLATION QUALIFICATION OF HOLDING VESSEL- 50 LTRS
  10. OPERATIONAL QUALIFICATION OF HOLDING VESSEL 50 LTRS.
  11. PERFORMANCE QUALIFICATION OF VESSELS
  12. DESIGN QUALIFICATION OF TUBE FILLING MACHINE
  13. INSTALLATION QUALIFICATION OF DOUBLE HEAD TUBE FILLING MACHINE
  14. OPERATIONAL QUALIFICATION OF DOUBLE HEAD TUBE FILLING MACHINE
  15. PERFORMANCE QUALIFICATION OF DOUBLE HEAD TUBE FILLING MACHINE
  16. INSTALLATION QUALIFICATION OF CARTONING MC
  17. OPERATIONAL QUALIFICATION OF CARTONING MC (CP-150)
  18. PERFORMANCE QUALIFICATION OF CARTONING MACHINE
  19. DESIGN QUALIFICATION FOR AIRJET BOTTLE CLEANING MACHINE
  20. INSTALLATION QUALIFICATION FOR AIRJET BOTTLE CLEANING MACHINE
  21. DESIGN QUALIFICATION FOR AUTOCARTONATOR
  22. INSTALLATION QUALIFICATION FOR AUTOCARTONATOR
  23. OPERATIONAL QUALIFICATION FOR AUTOCARTONATOR
  24. PERFORMANCE QUALIFICATION PROTOCOL FOR AUTOCARTONATOR
  25. PERFORMANCE QUALIFICATION REPORT FOR AUTOCARTONATOR
  26. DESIGN QUALIFICATION FOR AUTOMATIC STICKER LABELLING MACHINE
  27. INSTALLATION QUALIFICATION FOR AUTOMATIC STICKER LABELING MACHINE
  28. OPERATIONAL QUALIFICATION FOR AUTOMATIC STICKER LABELING MACHINE
  29. PERFORMANCE QUALIFICATION PROTOCOL FOR AUTOMATIC STICKER LABELING MACHINE
  30. PERFORMANCE QUALIFICATION REPORT FOR AUTOMATIC STICKER LABELING MACHINE
  31. DESIGN QUALIFICATION FOR CHECK WEIGHER MACHINE
  32. INSTALLATION QUALIFICATION FOR CHECKWEIGHER MACHINE
  33. OPERATIONAL QUALIFICATION FOR CHECK WEIGHER MACHINE
  34. PERFORMANCE QUALIFICATION PROTOCOL FOR CHECK WEIGHER MACHINE
  35. PERFORMANCE QUALIFICATION REPORT FOR CHECK WEIGHER MACHINE
  36. DESIGN QUALIFICATION FOR CIP SYSTEM
  37. INSTALLATION QUALIFICATION FOR CIP SYSTEM
  38. OPERATIONAL QUALIFICATION FOR CIP SYSTEM
  39. DESIGN QUALIFICATION FOR DEDUSTING TUNNEL
  40. OPERATIONAL QUALIFICATION FOR DEDUSTING TUNNEL
  41. DESIGN QUALIFICATION FOR DOUBLE HEAD AUTOMATIC FILLING, CLOSING AND SEALING MACHINE
  42. DESIGN QUALIFICATION FOR DOUBLE HEAD TUBE FILLING MACHINE GAN COMBI
  43. DESIGN QUALIFICATION FOR DYNAMIC PASS BOX
  44. DESIGN QUALIFICATION FOR LEAK TEST APPARATUS
  45. INSTALLATION QUALIFICATION FOR LEAK TEST APPARATUS
  46. OPERATIONAL QUALIFICATION FOR LEAK TEST APPARATUS
  47. DESIGN QUALIFICATION FOR MULTI MIX MANUFACTURING PLANT
  48. INSTALLATION QUALIFICATION FOR MULTI MIX MANUFACTURING PLANT
  49. OPERATIONAL QUALIFICATION FOR MULTI MIX MANUFACTURING PLANT
  50. DESIGN QUALIFICATION FOR MULTI MIXER 250 kg
  51. INSTALLATION QUALIFICATION FOR MULTI-MIXER 250 kg
  52. OPERATIONAL QUALIFICATION FOR MULTI MIXER 250-kg
  53. DESIGN QUALIFICATION FOR MULTI MIXER 500 kg
  54. INSTALLATION QUALIFICATION FOR MULTI MIXER 500 kg
  55. OPERATIONAL QUALIFICATION FOR MULTI MIXER 500-kg
  56. PERFORMANCE QUALIFICATION PROTOCOL FOR MULTI MIXER 500-kg
  57. DESIGN QUALIFICATION FOR RLAF
  58. DESIGN QUALIFICATION FOR SEMI AUTOMATIC CRIMPING MACHINE
  59. DESIGN QUALIFICATION FOR SINGLE HEAD SEMI AUTOMATIC TUBE FILLING, CRIMPING AND SEALING MACHINE
  60. DESIGN QUALIFICATION FOR STIRRER
  61. DESIGN QUALIFICATION FOR SIX HEAD LOTION FILLING MACHINE
  62. DESIGN QUALIFICATION FOR STATIC PASS-BOX
  63. DESIGN QUALIFICATION FOR VERTICAL LAMINAR AIR FLOW
  64. INSTALLATION QUALIFICATION FOR AUTOMATIC TWO HEAD CAPPING MACHINE
  65. INSTALLATION QUALIFICATION FOR DOUBLE HEAD TUBE FILLING MACHINE GAN COMBI
  66. INSTALLATION QUALIFICATION FOR JACKETED MANUFACTURING TANK
  67. INSTALLATION QUALIFICATION FOR MANUFACTURING TANK
  68. INSTALLATION QUALIFICATION FOR SEMI-AUTOMATIC CRIMPING MACHINE
  69. INSTALLATION QUALIFICATION FOR SINGLE HEAD SEMI AUTOMATIC TUBE FILLING, CRIMPING AND SEALING MACHINE
  70. INSTALLATION QUALIFICATION FOR SIX HEAD LOTION FILLING MACHINE
  71. INSTALLATION QUALIFICATION FOR SINGLE HEAD AUTOMATIC POWDER FILLING MACHINE
  72. DESIGN QUALIFICATION FOR SINGLE HEAD AUTOMATIC POWDER FILLING MACHINE
  73. OPERATIONAL QUALIFICATION FOR AUTOMATIC TWO HEAD CAPPING MACHINE
  74. OPERATIONAL QUALIFICATION FOR DOUBLE HEAD FULLY AUTOMATIC FILLLING, CLOSING AND SEALING MACHINE
  75. OPERATIONAL QUALIFICATION FOR DOUBLE HEAD TUBE FILLING MACHINE GAN COMBI
  76. OPERATIONAL QUALIFICATION FOR MANUFACTURING TANK
  77. OPERATIONAL QUALIFICATION FOR REVERSE LAMINAR AIR FLOW
  78. OPERATIONAL QUALIFICATION FOR SEMI-AUTOMATIC CRIMPING MACHINE
  79. OPERATIONAL QUALIFICATION FOR SINGLE HEAD AUTOMATIC POWDER FILLING MACHINE
  80. OPERATIONAL QUALIFICATION FOR SINGLE HEAD SEMI AUTOMATIC TUBE FILLING, CRIMPING AND SEALING MACHINE
  81. OPERATIONAL QUALIFICATION FOR SIX HEAD LOTION FILLING MACHINE
  82. PERFORMANCE QUALIFICATION PROTOCOL FOR INDUCTION SEALING MACHINE
  83. PERFORMANCE QUALIFICATION PROTOCOL FOR AUTOMATIC TWO HEAD CAPPING MACHINE
  84. PERFORMANCE QUALIFICATION PROTOCOL FOR DOUBLE HEAD FULLY AUTOMATIC FILLING , CLOSING AND SEALING MACHINE
  85. PERFORMANCE QUALIFICATION PROTOCOL FOR DOUBLE HEAD TUBE FILLING MACHINE GAN COMBI
  86. PERFORMANCE QUALIFICATION PROTOCOL FOR MANUFACTURING TANK
  87. PERFORMANCE QUALIFICATION PROTOCOL FOR HOT AIR OVEN
  88. PERFORMANCE QUALIFICATION PROTOCOL FOR MULTI-MIX MANUFACTURING PLANT
  89. PERFORMANCE QUALIFICATION PROTOCOL FOR SEMI-AUTOMATIC CRIMPING MACHINE
  90. PERFORMANCE QUALIFICATION PROTOCOL FOR SHRINK WRAPPING MACHINE
  91. PERFORMANCE QUALIFICATION PROTOCOL FOR SINGLE HEAD AUTOMATIC POWDER FILLING MACHINE
  92. PERFORMANCE QUALIFICATION PROTOCOL FOR SINGLE HEAD SEMI AUTOMATIC TUBE FILLING, CRIMPING AND SEALING MACHINE
  93. PERFORMANCE QUALIFICATION PROTOCOL FOR SIX HEAD LOTION FILLING MACHINE
  94. PERFORMANCE QUALIFICATION REPORT FOR DOUBLE HEAD FULLY AUTOMATIC FILLING , CLOSING AND SEALING MACHINE
  95. PERFORMANCE QUALIFICATION REPORT FOR DOUBLE HEAD TUBE FILLING MACHINE GAN COMBI
  96. PERFORMANCE QUALIFICATION REPORT FOR HOT AIR OVEN
  97. PERFORMANCE QUALIFICATION REPORT FOR JACKETED MANUFACTURING
  98. PERFORMANCE QUALIFICATION REPORT FOR MANUFACTURING TANK
  99. PERFORMANCE QUALIFICATION REPORT FOR MULTI-MIX MANUFACTURING TANK
  100. PERFORMANCE QUALIFICATION REPORT FOR SEMI- AUTOMATIC CRIMPING MACHINE
  101. PERFORMANCE QUALIFICATION REPORT FOR SHRINK WRAPPING MACHINE
  102. PERFORMANCE QUALIFICATION REPORT FOR SINGLE HEAD AUTOMETIC POWDER FILLING MACHINE
  103. PERFORMANCE QUALIFICATION REPORT FOR SIX HEAD LOTION FILLING MACHINE
  104. PERFORMANCE QUALIFICATION REPORT FOR SIX HEAD LOTION FILLING MACHINE

2 Responses

    1. Need Your support,
      Please provide us pharma related documents so that we can help each other, the number of docs you provide the same number you can get in exchange.

Leave a Reply

Your email address will not be published. Required fields are marked *

error: Content is protected !!