RISK BASED INSPECTION [SCHEDULE M-POINT (8.8)]
![RISK BASED INSPECTION [SCHEDULE M-POINT (8.8)]](https://pharmadevils.com/wp-content/uploads/2024/10/Schedule-M-8.8-768x1086.jpg)
Risk-Based Inspection (RBI) increases inspection depth for high-risk utilities like water systems, using a risk-based approach that considers facility/product risk and compliance history. CDSCO Schedule M – Point 8.8 (Microbiological monitoring of water) Schedule M 8.8 requires that there is…





![RISK BASED INSPECTION [SCHEDULE M-POINT (8.7)]](https://pharmadevils.com/wp-content/uploads/2024/10/Schedule-M-8.7-768x1086.jpg)







