Ointments qualifications in pharma plays a significant role. Ointments are cosmetic products that are applied externally to the skin. When applied to the skin, they frequently have an oily or greasy consistency and may feel “stiff.” Ointment bases come in three main categories: oleaginous (greasy) bases, which reject water; water-absorbing bases, which are also greasy but enable water to absorb; and water-miscible bases (vanishing creams or water-soluble bases).
Types of Ointments (On the basis of penetration):
- Epidermic Ointment: These Ointments are intended to produce their action on the surface of the skin and produce local effect, they are not absorbed.
- Endodermic Ointment: These Ointments are intended to release the medicaments that penetrate into skin.
- Diadermic Ointment: These Ointments are intended to release the medicament that pass through the skin and produce systemic effect.
Ointments are made in the pharmaceutical industry by melting oil and aqueous phases in two distinct jacketed vessels with agitators to ensure correct mixing. Through valves and pipes, the two stages are transported to the main ointment vessel. Agitation is produced by the additional stirrers in the primary vessel. A consistent combination of the base and medication is essential during the entire procedure. Potential difficulties resulting from ineffective mixing and poor mixer design include the formation of agglomerates and non-uniform medication distribution in the base. In the dead places of the vessel, the content is not evenly mixed. As a result, additional actions are needed for recirculation to prevent product waste accumulated at dead spots.
- INSTALLATION QUALIFICATION OF WATER PHASE VESSEL- 1260 LTRS
- OPERATIONAL QUALIFICATION OF WATER PHASE VESSEL
- INSTALLATION QUALIFICATION OF WAX PHASE VESSEL- 1260 LTRS
- OPERATIONAL QUALIFICATION OF WAX PHASE VESSEL
- INSTALLATION QUALIFICATION OF MANUFACTURING VESSEL-1765 LTRS.
- OPERATIONAL QUALIFICATION OF MAIN MANUFACTURING VESSEL
- INSTALLATION QUALIFICATION OF STORAGE TANK-1900 LTRS.
- OPERATIONAL QUALIFICATION OF STORAGE TANK
- INSTALLATION QUALIFICATION OF HOLDING VESSEL- 50 LTRS
- OPERATIONAL QUALIFICATION OF HOLDING VESSEL 50 LTRS.
- PERFORMANCE QUALIFICATION OF VESSELS
- DESIGN QUALIFICATION OF TUBE FILLING MACHINE
- INSTALLATION QUALIFICATION OF DOUBLE HEAD TUBE FILLING MACHINE
- OPERATIONAL QUALIFICATION OF DOUBLE HEAD TUBE FILLING MACHINE
- PERFORMANCE QUALIFICATION OF DOUBLE HEAD TUBE FILLING MACHINE
- INSTALLATION QUALIFICATION OF CARTONING MC
- OPERATIONAL QUALIFICATION OF CARTONING MC (CP-150)
- PERFORMANCE QUALIFICATION OF CARTONING MACHINE
- DESIGN QUALIFICATION FOR AIRJET BOTTLE CLEANING MACHINE
- INSTALLATION QUALIFICATION FOR AIRJET BOTTLE CLEANING MACHINE
- DESIGN QUALIFICATION FOR AUTOCARTONATOR
- INSTALLATION QUALIFICATION FOR AUTOCARTONATOR
- OPERATIONAL QUALIFICATION FOR AUTOCARTONATOR
- PERFORMANCE QUALIFICATION PROTOCOL FOR AUTOCARTONATOR
- PERFORMANCE QUALIFICATION REPORT FOR AUTOCARTONATOR
- DESIGN QUALIFICATION FOR AUTOMATIC STICKER LABELLING MACHINE
- INSTALLATION QUALIFICATION FOR AUTOMATIC STICKER LABELING MACHINE
- OPERATIONAL QUALIFICATION FOR AUTOMATIC STICKER LABELING MACHINE
- PERFORMANCE QUALIFICATION PROTOCOL FOR AUTOMATIC STICKER LABELING MACHINE
- PERFORMANCE QUALIFICATION REPORT FOR AUTOMATIC STICKER LABELING MACHINE
- DESIGN QUALIFICATION FOR CHECK WEIGHER MACHINE
- INSTALLATION QUALIFICATION FOR CHECKWEIGHER MACHINE
- OPERATIONAL QUALIFICATION FOR CHECK WEIGHER MACHINE
- PERFORMANCE QUALIFICATION PROTOCOL FOR CHECK WEIGHER MACHINE
- PERFORMANCE QUALIFICATION REPORT FOR CHECK WEIGHER MACHINE
- DESIGN QUALIFICATION FOR CIP SYSTEM
- INSTALLATION QUALIFICATION FOR CIP SYSTEM
- OPERATIONAL QUALIFICATION FOR CIP SYSTEM
- DESIGN QUALIFICATION FOR DEDUSTING TUNNEL
- OPERATIONAL QUALIFICATION FOR DEDUSTING TUNNEL
- DESIGN QUALIFICATION FOR DOUBLE HEAD AUTOMATIC FILLING, CLOSING AND SEALING MACHINE
- DESIGN QUALIFICATION FOR DOUBLE HEAD TUBE FILLING MACHINE GAN COMBI
- DESIGN QUALIFICATION FOR DYNAMIC PASS BOX
- DESIGN QUALIFICATION FOR LEAK TEST APPARATUS
- INSTALLATION QUALIFICATION FOR LEAK TEST APPARATUS
- OPERATIONAL QUALIFICATION FOR LEAK TEST APPARATUS
- DESIGN QUALIFICATION FOR MULTI MIX MANUFACTURING PLANT
- INSTALLATION QUALIFICATION FOR MULTI MIX MANUFACTURING PLANT
- OPERATIONAL QUALIFICATION FOR MULTI MIX MANUFACTURING PLANT
- DESIGN QUALIFICATION FOR MULTI MIXER 250 kg
- INSTALLATION QUALIFICATION FOR MULTI-MIXER 250 kg
- OPERATIONAL QUALIFICATION FOR MULTI MIXER 250-kg
- DESIGN QUALIFICATION FOR MULTI MIXER 500 kg
- INSTALLATION QUALIFICATION FOR MULTI MIXER 500 kg
- OPERATIONAL QUALIFICATION FOR MULTI MIXER 500-kg
- PERFORMANCE QUALIFICATION PROTOCOL FOR MULTI MIXER 500-kg
- DESIGN QUALIFICATION FOR RLAF
- DESIGN QUALIFICATION FOR SEMI AUTOMATIC CRIMPING MACHINE
- DESIGN QUALIFICATION FOR SINGLE HEAD SEMI AUTOMATIC TUBE FILLING, CRIMPING AND SEALING MACHINE
- DESIGN QUALIFICATION FOR STIRRER
- DESIGN QUALIFICATION FOR SIX HEAD LOTION FILLING MACHINE
- DESIGN QUALIFICATION FOR STATIC PASS-BOX
- DESIGN QUALIFICATION FOR VERTICAL LAMINAR AIR FLOW
- INSTALLATION QUALIFICATION FOR AUTOMATIC TWO HEAD CAPPING MACHINE
- INSTALLATION QUALIFICATION FOR DOUBLE HEAD TUBE FILLING MACHINE GAN COMBI
- INSTALLATION QUALIFICATION FOR JACKETED MANUFACTURING TANK
- INSTALLATION QUALIFICATION FOR MANUFACTURING TANK
- INSTALLATION QUALIFICATION FOR SEMI-AUTOMATIC CRIMPING MACHINE
- INSTALLATION QUALIFICATION FOR SINGLE HEAD SEMI AUTOMATIC TUBE FILLING, CRIMPING AND SEALING MACHINE
- INSTALLATION QUALIFICATION FOR SIX HEAD LOTION FILLING MACHINE
- INSTALLATION QUALIFICATION FOR SINGLE HEAD AUTOMATIC POWDER FILLING MACHINE
- DESIGN QUALIFICATION FOR SINGLE HEAD AUTOMATIC POWDER FILLING MACHINE
- OPERATIONAL QUALIFICATION FOR AUTOMATIC TWO HEAD CAPPING MACHINE
- OPERATIONAL QUALIFICATION FOR DOUBLE HEAD FULLY AUTOMATIC FILLLING, CLOSING AND SEALING MACHINE
- OPERATIONAL QUALIFICATION FOR DOUBLE HEAD TUBE FILLING MACHINE GAN COMBI
- OPERATIONAL QUALIFICATION FOR MANUFACTURING TANK
- OPERATIONAL QUALIFICATION FOR REVERSE LAMINAR AIR FLOW
- OPERATIONAL QUALIFICATION FOR SEMI-AUTOMATIC CRIMPING MACHINE
- OPERATIONAL QUALIFICATION FOR SINGLE HEAD AUTOMATIC POWDER FILLING MACHINE
- OPERATIONAL QUALIFICATION FOR SINGLE HEAD SEMI AUTOMATIC TUBE FILLING, CRIMPING AND SEALING MACHINE
- OPERATIONAL QUALIFICATION FOR SIX HEAD LOTION FILLING MACHINE
- PERFORMANCE QUALIFICATION PROTOCOL FOR INDUCTION SEALING MACHINE
- PERFORMANCE QUALIFICATION PROTOCOL FOR AUTOMATIC TWO HEAD CAPPING MACHINE
- PERFORMANCE QUALIFICATION PROTOCOL FOR DOUBLE HEAD FULLY AUTOMATIC FILLING , CLOSING AND SEALING MACHINE
- PERFORMANCE QUALIFICATION PROTOCOL FOR DOUBLE HEAD TUBE FILLING MACHINE GAN COMBI
- PERFORMANCE QUALIFICATION PROTOCOL FOR MANUFACTURING TANK
- PERFORMANCE QUALIFICATION PROTOCOL FOR HOT AIR OVEN
- PERFORMANCE QUALIFICATION PROTOCOL FOR MULTI-MIX MANUFACTURING PLANT
- PERFORMANCE QUALIFICATION PROTOCOL FOR SEMI-AUTOMATIC CRIMPING MACHINE
- PERFORMANCE QUALIFICATION PROTOCOL FOR SHRINK WRAPPING MACHINE
- PERFORMANCE QUALIFICATION PROTOCOL FOR SINGLE HEAD AUTOMATIC POWDER FILLING MACHINE
- PERFORMANCE QUALIFICATION PROTOCOL FOR SINGLE HEAD SEMI AUTOMATIC TUBE FILLING, CRIMPING AND SEALING MACHINE
- PERFORMANCE QUALIFICATION PROTOCOL FOR SIX HEAD LOTION FILLING MACHINE
- PERFORMANCE QUALIFICATION REPORT FOR DOUBLE HEAD FULLY AUTOMATIC FILLING , CLOSING AND SEALING MACHINE
- PERFORMANCE QUALIFICATION REPORT FOR DOUBLE HEAD TUBE FILLING MACHINE GAN COMBI
- PERFORMANCE QUALIFICATION REPORT FOR HOT AIR OVEN
- PERFORMANCE QUALIFICATION REPORT FOR JACKETED MANUFACTURING
- PERFORMANCE QUALIFICATION REPORT FOR MANUFACTURING TANK
- PERFORMANCE QUALIFICATION REPORT FOR MULTI-MIX MANUFACTURING TANK
- PERFORMANCE QUALIFICATION REPORT FOR SEMI- AUTOMATIC CRIMPING MACHINE
- PERFORMANCE QUALIFICATION REPORT FOR SHRINK WRAPPING MACHINE
- PERFORMANCE QUALIFICATION REPORT FOR SINGLE HEAD AUTOMETIC POWDER FILLING MACHINE
- PERFORMANCE QUALIFICATION REPORT FOR SIX HEAD LOTION FILLING MACHINE
- PERFORMANCE QUALIFICATION REPORT FOR SIX HEAD LOTION FILLING MACHINE