RISK BASED INSPECTION (SCHEDULE M -POINT (4.14-4.15)

In Risk-Based Inspection (RBI), Schedule M points 4.14–4.15 are treated as critical utility controls because failures in WFI storage/sanitization or WFI quality can directly cause microbial/endotoxin contamination in sterile products. 4.14: Sanitization process of SS WFI storage tank This checkpoint…













