RISK BASED INSPECTION (SCHEDULE M -POINT (4.29)

In a risk-based inspection (RBI), Schedule M point 4.29 expects you to “specify the system in place for the compressed gases / air used in the facility.” CDSCO RBI treats this as high risk because compressed air/gases can introduce oil,…













