RISK BASED INSPECTION (SCHEDULE M -POINT (4.17)

In a risk-based inspection (RBI), Schedule M – point 4.17 (as captured in the CDSCO RBI checklist under water systems) is treated as a critical utility control because Water for Injection (WFI) can rapidly become a contamination source if storage/distribution…















