Chemical SOP
Microbiology SOP
Warehouse SOP
Manufacturing SOP
Information technology SOP

RISK BASED INSPECTION [SCHEDULE M-POINT (8.21-8.24)]

RISK BASED INSPECTION [SCHEDULE M-POINT (8.21-8.24)]

Post Views: 677 In a risk-based inspection (RBI), Schedule M points 8.21–8.24 are assessed as packaging mix-up and contamination controls, because failures with labels/foils/leaflets can directly cause wrong product identity, wrong batch/expiry, wrong cautions, and costly recalls. 8.21 – Control…

RISK BASED INSPECTION [SCHEDULE M-POINT (8.18-8.20)]

RISK BASED INSPECTION [SCHEDULE M-POINT (8.18-8.20)]

Post Views: 560 Risk-Based Inspection (RBI) increases inspection depth where the potential patient risk is highest—and packaging/label controls are always high risk because mix-ups can lead to wrong medicine, wrong strength, wrong batch/expiry and rapid recalls. CDSCO In the CDSCO…

RISK BASED INSPECTION [SCHEDULE M-POINT (8.16-8.17)]

RISK BASED INSPECTION [SCHEDULE M-POINT (8.16-8.17)]

Post Views: 650 In a risk-based inspection (RBI), Schedule M points 8.16–8.17 are treated as high-severity safety and contamination-prevention controls because poor storage of solvents and inflammable materials can trigger fire/explosion, toxic exposure, environmental noncompliance, and product cross-contamination. 8.16 –…

RISK BASED INSPECTION [SCHEDULE M-POINT (8.13-8.15)]

RISK BASED INSPECTION [SCHEDULE M-POINT (8.13-8.15)]

Post Views: 535 Risk-Based Inspection (RBI) is a GMP approach where inspectors decide the frequency, depth and breadth of inspection using Quality Risk Management, focusing more effort on systems that can most impact patient safety and product quality. CDSCO In…

RISK BASED INSPECTION [SCHEDULE M-POINT (8.10-8.12)]

RISK BASED INSPECTION [SCHEDULE M-POINT (8.10-8.12)]

Post Views: 466 In Risk-Based Inspection (RBI), warehouse and sampling controls are treated as high-impact because a single mix-up, contamination event, or wrong status release in materials can affect multiple batches. Schedule M / WHO checklist intent for 8.10–8.12 8.10…

RISK BASED INSPECTION [SCHEDULE M-POINT (8.9)]

RISK BASED INSPECTION [SCHEDULE M-POINT (8.9)]

Post Views: 418 Risk-Based Inspection (RBI) – Schedule M Point 8.9 (Quarantine segregation & restricted access) What 8.9 checks (RBI checklist intent): Inspectors verify how quarantined materials are segregated from other materials and how access to the quarantined area is…

RISK BASED INSPECTION [SCHEDULE M-POINT (8.8)]

RISK BASED INSPECTION [SCHEDULE M-POINT (8.8)]

Post Views: 504 Risk-Based Inspection (RBI) increases inspection depth for high-risk utilities like water systems, using a risk-based approach that considers facility/product risk and compliance history. CDSCO Schedule M – Point 8.8 (Microbiological monitoring of water) Schedule M 8.8 requires…

RISK BASED INSPECTION [SCHEDULE M-POINT (8.7)]

RISK BASED INSPECTION [SCHEDULE M-POINT (8.7)]

Post Views: 618 Schedule M – Point 8.7 (Water & Steam Systems for sterile manufacturing) requires that there is a written procedure and program for sanitation of the different water systems—covering storage tanks, distribution lines, pumps and related equipment—and that…

RISK BASED INSPECTION (WHO TRS 986-POINT (8.6)

RISK BASED INSPECTION (WHO TRS 986-POINT (8.6)

Post Views: 542 WHO TRS 986 – Point 8.6 (Follow-up action) requires that there is an effective follow-up programme after self-inspection, and that company management evaluates both the self-inspection report and the corrective actions as necessary. In a Risk-Based Inspection…

error: Content is protected !!

This is the Premium Content

You can access this page after paying the subscription fees of 21 ₹ /month only.