Post Views: 521 Risk-Based Inspection (RBI) – Schedule L1 Point 38.5 (QC Department Safety) asks: “Specify the safety measures taken to avoid any accidental hazards in the QC department.” Under RBI, this is treated as a high-impact, high-likelihood control because…

RISK BASED INSPECTION [SCHEDULE L1-POINT (38.4)]

RISK BASED INSPECTION [SCHEDULE L1-POINT (38.4)]

Post Views: 654 In a risk-based inspection (RBI), Schedule L1 – Point 38.4 checks whether the QC laboratory has effective arrangements to protect sensitive electronic balances from vibrations, electrical interference, and humidity, because these factors can silently bias weighing results…

RISK BASED INSPECTION [SCHEDULE M-POINT (34.16)]

RISK BASED INSPECTION [SCHEDULE M-POINT (34.16)]

Post Views: 764 In a risk-based inspection (RBI), Schedule M point 34.16 checks a high-impact documentation risk: whether the Batch Production Record (BPR) is based on the current, approved Master Formula Record (MFR). If an outdated MFR is used, the…

RISK BASED INSPECTION [SCHEDULE M-POINT (34.15)]

RISK BASED INSPECTION [SCHEDULE M-POINT (34.15)]

Post Views: 611 Risk-Based Inspection (RBI) is an inspection planning approach where regulators priorities what to inspect and how deeply based on risk to patient safety and product quality, using Quality Risk Management to decide inspection frequency and scope. Schedule…

RISK BASED INSPECTION [SCHEDULE M-POINT (34.14)]

RISK BASED INSPECTION [SCHEDULE M-POINT (34.14)]

Post Views: 436 In Risk-Based Inspection (RBI), Schedule M checklist point 34.14 is used to verify whether the Batch Packaging Record (BPR) is complete against global GMP expectations, i.e., it “covers all the points as prescribed in WHO TRS 986…

RISK BASED INSPECTION [SCHEDULE M-POINT (34.13)]

RISK BASED INSPECTION [SCHEDULE M-POINT (34.13)]

Post Views: 529 Risk-Based Inspection (RBI) – Schedule M Point 34.13 checks whether the Batch Packaging Record (BPR) covers all points prescribed in Schedule M. CDSCO Under RBI, packaging records are treated as high patient-risk because packaging errors can cause…

RISK BASED INSPECTION [SCHEDULE M-POINT (34.11-34.12)]

RISK BASED INSPECTION [SCHEDULE M-POINT (34.11-34.12)]

Post Views: 725 In a risk-based inspection (RBI), Schedule M points 34.11–34.12 focus on preventing one of the most serious packaging failures: printed component misuse (wrong label/carton/foil/leaflet), which can cause mislabelling, mix-ups, and recalls. 34.11 – Destruction of excess printed…

RISK BASED INSPECTION [SCHEDULE M-POINT (34.9-34.10)]

RISK BASED INSPECTION [SCHEDULE M-POINT (34.9-34.10)]

Post Views: 848 Risk Based Inspection (RBI) – Schedule M Points 34.9–34.10 focus on packaging yield control and reconciliation, because packaging is one of the highest-risk stages for mix-ups, mislabeling, and undocumented losses. Point 34.9 (Immediate batch yield calculation) Inspectors…

RISK BASED INSPECTION [WHO TRS 986-POINT (34.8)]

RISK BASED INSPECTION [WHO TRS 986-POINT (34.8)]

Post Views: 604 WHO TRS 986 – Point 34.8 (as used in RBI checklists): “Monitoring code for final packing materials” means the site must define and implement a code-based control (e.g., bar code, pinholes, 2D code, colour/emboss coding, hologram/OVD) to…

RISK BASED INSPECTION [SCHEDULE M-POINT (34.7)]

RISK BASED INSPECTION [SCHEDULE M-POINT (34.7)]

Post Views: 431 Risk-Based Inspection (RBI) – Schedule M Point 34.7 (Packaging material quantity verification) focuses on a high-patient-risk failure mode: printed/primary packaging material mismatch leading to mix-ups, wrong-label packs, missing labels, or unaccounted printed components. What Schedule M 34.7…

RISK BASED INSPECTION [SCHEDULE M-POINT (34.5-34.6)]

RISK BASED INSPECTION [SCHEDULE M-POINT (34.5-34.6)]

Post Views: 424 Risk-Based Inspection (RBI) – Schedule M Points 34.5–34.6 focus on preventing packaging mix-ups and contamination—high patient-risk failures because a correct tablet in a wrong pack is still a serious defect. 34.5: Packaging materials arrive on a covered…

RISK BASED INSPECTION [SCHEDULE M-POINT (34.4)]

RISK BASED INSPECTION [SCHEDULE M-POINT (34.4)]

Post Views: 578 Risk Based Inspection (RBI) increases inspection depth where patient-risk is highest. In packaging, the biggest risks are mix-ups, wrong label/expiry, and cross-contamination—so RBI heavily focuses on line clearance discipline and its records. Schedule M – Point 34.4…